Pipe loads
With over 800 loads just like these scheduled for a major pipeline project, NS is using every available inch of space to store these cars until they can be unloaded.
Date:
7/8/2010
Location:
Collier, GA
Map
Views:
221
Collection Of:
Joe Hill
Author:
Joe Hill
Picture Categories:
This picture is part of album:
Oddball Flatcar Loads
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=2132498