This procedure done to correctly gauge the track. Regrettably, other commitments kept me away from actually watching the wood ties go in. :'( |
Date:
8/4/2015 |
Location:
Reusens, VA Map ![Show Reusens on a rail map](/images/map_us.gif) |
Views:
134 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
G. R. Harper |
|
Author: G. R. Harper
|
![M of W does a little cleaning up after every fifth concrete tie was replaced with wood](http://s3.amazonaws.com/rrpa_photos/24087/Tie%20Work%20-%20M%20of%20W%20machines%20in%20dam%20curve.%2004AUG2015.JPG) |
Picture Categories: |
This picture is part of album: Rails at Reusens |